新疆吉林台抽水蓄能电站引水隧洞线路工程地质条件遥感解译评价  被引量:1

Remote Sensing Evaluation Based on Engineering Geological Investigation of Diversion Tunnel in Jilintai Pumped Storage Power Station of Xinjiang

在线阅读下载全文

作  者:胡宗云[1] 姬俊虎[1] 陈洁[2] 

机构地区:[1]水利部长江勘测技术研究所,湖北武汉430011 [2]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000

出  处:《资源环境与工程》2012年第5期530-532,共3页Resources Environment & Engineering

摘  要:拟建吉林台抽水蓄能电站位于天山山脉博罗霍洛山以南,喀什河盆地北部莫托向斜洼地及博罗霍洛山中高山区,工程引水隧洞长10 km左右,上、下库正常引水位差720 m。采用数字影像处理、地理信息系统、遥感地质解译的勘测新技术手段,对引水隧洞线路工程区的工程地质条件进行分析评价。The proposed Jilintai pumped storage power station is located in the south of the Bolhinur Mountain Region(the Tianshan Mountains),the Moto synclinal depression in the northern of Kashi River Basin and high mountain area of the Bolhinur Mt.The engineering diversion tunnel is about 10 km long,and there is 720 m normal diversion potentiometer between the upper and lower reservoir.By digital image processing,geographic information system and remote sensing,the authors analyze the geological conditions and problems in the planned diversion tunnel line.

关 键 词:引水隧洞 数字影像处理 遥感解译 工程地质分区 

分 类 号:P237[天文地球—摄影测量与遥感] U452.1[天文地球—测绘科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象