检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:彭立春
机构地区:[1]上海毅祖教育信息咨询有限公司,上海200031 [2]上海彭老师注册给排水培训班,上海201620
出 处:《工业用水与废水》2012年第5期61-63,共3页Industrial Water & Wastewater
摘 要:在GB 50015—2003《建筑给水排水设计规范》(2009年版)的具体应用过程中,发现热水系统小时变化系数Kh的计算方法有待商榷,特提出来进行分析与探讨。提出了Kh计算的建议性方法,并建议"新版建水规"中补充用水定额取高(低)值、使用人(床)数少(多)及用水定额介于规范规定值之间,但使用人(床)数小于等于规范规定的下限值(或者大于等于规范规定的上限值)时,Kh该如何取值或者计算;建议"新版建水规"中补充二元内插法计算Kh所需要的表格,以方便广大工程设计人员查阅。In the specific implementation process of GB 50015--2003 Code for Design of Building Water Supply and Drainage(2009 edition), the calculation method of hourly variation coefficient for hot water system(Ka) were found to be questionable, therefore, the relevant analysis and discussion were carried out. A suggestive method of Kh calculation was proposed, and a suggestion on adding methods for value determination of hourly variation coefficient or its calculation when water quota is taken the high(or low) value, the number of people(or bed) less(or more) than the values or water quota between the value of the specification, but the number of people (or bed) less than or equal to the lower limit(or greater than the upper limit) were given to the Code(new edition). Besides, to complement the required forms for Ks binary interpolation into the Code ( new edition) was also proposed, so as to provide reference for engineering designers.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.73.229