检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄轶昕[1] 朱朝峰[2] 杭德荣[1] 李伟[1] 陈世军[3] 张科[4] 张正球 李水明[3] 彭汛[2]
机构地区:[1]江苏省血吸虫病防治研究所,无锡214064 [2]水利部长江水利委员会血吸虫病防治工作领导小组办公室 [3]江苏省句容市疾病预防控制中心 [4]江苏省南京市栖霞区疾病预防控制中心 [5]江苏省仪征市疾病预防控制中心
出 处:《中国血吸虫病防治杂志》2012年第5期522-526,共5页Chinese Journal of Schistosomiasis Control
基 金:水利部疾病防控项目(1260802570)
摘 要:目的评价通江河道及河口水利血防工程钉螺控制效果。方法选择老便民河、潘家河和新便民河3项水利血防工程作为研究对象,分别实施河岸硬化+河口溢流坝工程、河岸硬化+河口建闸工程和主河道及部分支流河岸硬化工程。现场观察工程实施前、后工程区及目标保护区钉螺面积和钉螺密度变化,比较不同水利血防工程对通江河道钉螺控制的效果。结果在实施常规药物灭螺条件下,老便民河工程实施后主河道钉螺即被消除,但目标保护区(支流河道及灌区)钉螺仍未能消除;潘家河工程实施后即消除了主河道及支流和灌区钉螺;新便民河工程实施后主河道钉螺面积下降89.22%,支流及灌区钉螺面积则维持不变。结论通江河道河口建闸或溢流坝更有利于工程区及目标保护区钉螺控制,在水位不稳定的通江河道实施水利血防工程应优先考虑控制水位和防止钉螺扩散。Objective To evaluate the effect of the water conservancy schistosomiasis control projects in rivers and estuaries connecting with the Yangtze River on Oncomelania snail control. Methods Three water conservancy schistosomiasis control projects of Laobianmin River,Panjia River and Bianmin River were chosen for the objects of the study. The concrete slope protection and the overflow dam,the concrete slope protection and the check sluice,and the simple concrete slope protection were built respectively in above mentioned three rivers. The changes of the area with snails and density of snails were investigated before and after the interventions,and the results were compared among the three projects. Results In the condition of the routine snail control with the molluscicide,the snails were eliminated in the main riverway of the Laobianmin River,but the snails still existed in the target protected area(tributaries of the river and irrigation areas);the snails were eliminated in the Panjia River and its irrigation areas;in the Bianmin River,the areas with snails dropped by 89.22% in the main river and still remained in the tributaries and irrigation areas after the project implementation. Conclusions The sluice and overflow dam more contribute to control and eliminate snails in the project areas and the target protected areas in the rivers and estuaries connecting with the Yangtze River.The priority of consideration should be given to the water level control and prevention of snail spreading in the water level instability rivers connecting with the Yangtze River.
关 键 词:钉螺 通江河道 水利血防工程 护坡 节制闸 溢流坝
分 类 号:R383.24[医药卫生—医学寄生虫学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.23.53