川东北高压高产气井完井测试工艺优化研究  被引量:2

Optimization and Study on Completion Test Tech of High Pressure and High Production Gas Well in Northeast Sichuan

在线阅读下载全文

作  者:陈科[1] 向乾[1] 曹学军[1] 丁亮亮[2] 

机构地区:[1]西南石油局井下作业公司,四川德阳618000 [2]西南石油大学,四川成都610500

出  处:《油气井测试》2012年第5期40-42,77,共3页Well Testing

摘  要:针对川东北高压高产气井测试面临的问题,以整个测试作业安全、高效完成为出发点,对川东北高压高产气井测试工艺优化技术开展研究,形成了一套适合川东北高压高产气井安全、优快、经济的完井测试配套技术。研究成果在川东北高压高产气井测试作业中的推广应用结果表明,测试成功率从77%提高到100%,有效提高了高压高产地层测试工程的设计和施工的科学性和准确性,为川东北地区三高气井测试作业的安全、高效提供了技术保障。According to well test problems facing to high pressure and production of gas well in Northeast Sichuan, taking the entire test operation to be safety, efficient completion as the starting point, research of the test process and its optimization technology has been done to form a set of suitable safety, fast, economical completion test matching technology. its applied results shows that the success rate improves from 77% to 100%, which effectively improves the well testing engineering design highly and the scientific nature and accuracy of the operation, and provides the technical support for safe, efficient well testing operation to the three high gas wells in Northeast Sichuan.

关 键 词:高温 高压 气井 测试工艺 优化设计 

分 类 号:TE27[石油与天然气工程—油气井工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象