检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江重庆航运工程勘察设计院,重庆401147
出 处:《水运工程》2012年第10期96-101,共6页Port & Waterway Engineering
摘 要:2003年以来长江宜宾—重庆段航道陆续按Ⅲ级航道标准进行了系统建设。建设过程中结合具体河势及碍航情况采取了单纯疏浚,顺坝与潜坝结合,疏浚配合丁坝、丁顺坝,疏浚、筑坝、护底配合等浅滩治理措施。结合实例对浅滩整治措施和效果进行分析。Yibin to Chongqing section of the Yangtze River waterway was constructed systematically since 2003 according to the standard of grade III channel. According to the river regime and navigation-obstruction situations, we took regulation measures including simple dredging, longitudinal dike with ground sills, dredging, spur dike with spur and longitudinal dike, dredging, dam construction with river bottom protection, as well as shallow governance, etc. in the process of the construction. The regulation measures and effect for the shoal were analyzed based on the engineering example.
分 类 号:U617[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195