检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中原石油勘探局采油六厂
出 处:《断块油气田》2000年第4期43-44,50,共3页Fault-Block Oil & Gas Field
摘 要:复杂断块油田桥 2 9块一类层严重水淹 ,注水启动二、三类层难度大 ,已进入中高含水开发阶段。分析区块开发面临的主要矛盾是 :井网密度大 ,平面调整余地小 ;含油层系单一 ,纵向上无法进行层系调整 ;储层非均质严重 ,砂体分布不稳定 ,设计经济效益井难度大。根据区块开发实际 ,深化地质基础研究 ,通过构造精细解释 ,储层综合评价 ,储量动用状况分析及剩余油分布规律研究 ,确定了区块的主要挖潜方向 :认识程度较低的断层边角部位构造复杂带、具有多套含油层系的屋脊断块高部位及局部剩余油富集区。通过应用双靶定向井调整挖潜技术 ,对改善区块开发效果起到了显著作用。The Q29 block is very complicated oilfield; it's good productive layers are watered seriously, and the bad layers are hard to be produced. The development of oil field entered into later stage of middle or high water cut. The more serious problems we faced are: the well density is too high to be adjusted; the productive layers are too single to adjust mini_layer longitudinally; Q29 oilfiled is an homogeneous reservoir. It is difficult to design economic adjustment wells. Based on the productive condition, we do a lot of fundamental geologic study, including: fine reservoir description, performance analysis, reservoir evaluation and remaining oil distribution law. At last, we find the potential tapping target: complicated block area, high structure position with rich remaining oil. Application of double target directional well technology in Q29 oil field, we gain a better productive result.
分 类 号:TE346[石油与天然气工程—油气田开发工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143