导管架平台隔水导管打桩优化设计研究  被引量:4

Optimization and Design Research of Drilling Conductor Piling on Jacket Platform

在线阅读下载全文

作  者:吴怡[1] 杨进[1] 魏倩[1] 韦红术 林海春 刘书杰 

机构地区:[1]中国石油大学(北京)石油工程学院,北京102249 [2]中海油深圳分公司,深圳518067 [3]中海油研究总院,北京100027

出  处:《船海工程》2012年第5期170-172,共3页Ship & Ocean Engineering

摘  要:为解决陆丰13-2导管架隔水导管打桩作业防斜及打桩过程控制问题,对该油田9口井槽隔水导管打桩作业从打桩设备的选用到打桩作业顺序优化设计进行分析研究,同时将隔水导管打桩优化设计结果与现场所收集的数据进行对比,对打桩作业进行全程监控和指导。研究表明,开展隔水导管打桩优化设计研究能够很好地指导现场打桩作业。Lufeng 13-2 jacket platform stand in deep water.In order to make the piling work smoothly,the conductor piling operations was analyzed for the nine well slots in this field.Considering the selection of equipment and assignments sequence optimization design of piling work,and comparing of our drilling conductor piling optimization design with the date from well site was made,the process of the piling operations were also monitored and guided.It showed that optimization design of drilling conductor piling guides the site work well for the Lufeng 13-2 oilfield.

关 键 词:导管架平台 隔水导管 打桩作业 

分 类 号:U674.38[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象