检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周建芬[1] 毛前[1] 王玉强[1] 张晓悦[1]
出 处:《人民长江》2012年第19期64-67,共4页Yangtze River
基 金:浙江省教育厅科研基金资助项目"土石坝应力场和渗流场的空间耦合方法的研究"(21211)
摘 要:基于非稳定渗流条件下应力场与渗流场耦合作用数值模型,研究某水库蓄水6 a内渗流量与坝基变形的情况。分析结果显示,在库区及坝体迎水面铺设全封闭土工膜情况下,水库蓄水初的5 a时间里库区坝基及坝址区域地下水位、渗漏量呈动态变化。库区坝基及坝下游水位和孔隙水压力在蓄水初5 a里可达到稳定,头2 a的变化较大。水库渗漏量在蓄水初的5 a里逐年递增最后达到稳定值。坝基最大沉降量出现在坝体底面中部,约为0.72 m。Based on the coupling numerical model of stress and seepage fields under unsteady seepage condition,we study the seepage volume and the deformation of dam foundation in 6 years since impoundment of a reservoir.In consideration of the enclosed geo-membrane laid on water side of the dam,a dynamic variation of water level and seepage volume at dam foundation and dam site is revealed for the first five years.In the five years,the water level and pore pressure of dam foundation and dam toe fluctuate heavily in the first two years and then tended to be stable,and the seepage volume of the reservoir first increase progressively and then become stable.The largest subsidence of dam body occurred in the middle of dam bottom with the largest value of 0.72 m.
关 键 词:全封闭土工膜 非稳定渗流 耦合作用 渗漏量 沉降
分 类 号:P642[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30