高坝大库水电工程导流阶段划分及度汛安全  被引量:2

Division of diversion stages and flood control for high dams with large reservoir

在线阅读下载全文

作  者:任金明[1] 葛益恒[1] 王永明[1] 

机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《大坝与安全》2012年第3期1-5,共5页Dam & Safety

基  金:"十一五"国家科技支撑计划项目(2008BAB29B02)

摘  要:随着我国大江大河高坝大水库工程的大量修建,特别是在施工导流过程中坝体临时挡水度汛、水库蓄水、临时导流泄水建筑物的分层设置等十分复杂问题的产生和解决,使得施工导流设计和施工的内涵也得到了很大的扩展和延伸。在"十一五"国家科技支撑计划项目课题中,通过大型水利水电工程导截流标准研究,提出了合理划分高坝大库水电工程初期、中期和后期导流的依据与原则。As more construction of high dams and large reservoirs, the occurrence and solving of some complex problems such as temporary flood protection by dam body, reservoir filling, layer set of temporary diversion discharge structure ex- tend the connotation of diversion design and construction. This paper introduced the research on standards for diversion and river closure. As well, some principles about reasonable division of initial, middle stage and later stage for hydropower project with high dam and large reservoir were put forward.

关 键 词:导流阶段 导流标准 导流程序 度汛安全 白鹤滩水电站 苗尾水电站 

分 类 号:TV212.53[水利工程—水文学及水资源] TV551.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象