检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西安科技大学建筑与土木工程学院,陕西西安710054
出 处:《煤矿安全》2012年第11期194-197,共4页Safety in Coal Mines
摘 要:根据锚杆杆体的轴向变形与围岩加固区的变形相协调,利用围岩加固区的变形确定锚杆的轴向变形,进而由应力应变关系求出锚杆荷载。在求加固区变形的过程中,将锚杆上的荷载近似的看作是分布在加固区边缘的均布荷载,求出硐室分别在地应力和锚杆荷载作用下的位移,锚杆两端的合位移即为加固区的变形,这样可以确定锚杆荷载与围岩参数的函数关系。The axial deformation of the bolt would coordinate the deformation of the reinforced area of the surrounding rock,the axial deformation of bolt can be determined by using the deformation of the reinforced area of the surrounding rock,and then the bolt loading is obtained by the stress-strain relationship.In the process of solving the deformation of reinforced area of the surrounding rock,the bolt loading is approximately as uniformly distributed loads distributed in the reinforced area edge,the rock cavern displacement in effect of geostress and bolt loading are solved,resultant displacement of both ends of bolt is the deformation of reinforced area,the function relation between bolt loading and rock mechanics parameters is determined.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3