检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江大学电气工程学院,杭州310027 [2]浙江水利水电专科学校,杭州310018
出 处:《华东电力》2012年第10期1743-1748,共6页East China Electric Power
摘 要:建立了考虑限流成本和潮流约束的风电准入容量非线性混合整数规划模型,研究了短路电流计算时,风电机群等值电抗的求取方法以及风电场并网参数和限流措施对节点阻抗修正矩阵的影响。引入免疫、稀释、变异等机制对PSO算法进行改进,得到了寻优效果更佳的MPSO算法,并与二分试探法联合求解最大并网风机群数。结合新英格兰10机39节点系统的仿真计算结果,证明了该方法有效可行。This paper establishes a nonlinear mixed integer programming model for maximum scale of wind farms considering constraints of current limiting cost and tide flow.Then for short-circuit current calculation,it probes into the calculation method for equivalent reactance of wind turbine group,as well as the effects of the wind farm grid-connection parameters and current-limiting measures on the node impedance modification matrix.PSO algorithm is improved by introducing immunization,dilution and variation mechanisms,formulating MPSO algorithm for the optimal effect and better solution to maximum grid-connected wind turbine group number by combining with dichotomy.The feasibility of this proposed method is verified by the simulation results of the 10-unit 39-node system of New England.
分 类 号:TM614[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28