大型抽水蓄能电站施工控制网复测与精度分析  

Measurement and Accuracy Analysis of Construction Control Network for Large Pumped Storage Power Station

在线阅读下载全文

作  者:徐顺明[1] 杨波[2] 

机构地区:[1]广州市地下铁道总公司,广州510380 [2]广东省水利电力勘测设计研究院,广州510170

出  处:《工程建设与设计》2012年第11期170-173,共4页Construction & Design for Engineering

摘  要:施工控制网是抽水蓄能电站土建施工和机电安装的重要基准,惠州抽水蓄能电站施工周期长(历时7a)必须定期复测、检验其稳定性,为施工提供稳定的测量精度。论文结合惠州抽水蓄能电站施工控制网复测实例,采用科学的方法进行复测,得出的结果与原成果进行的比较和分析,成果正确、稳定、可靠,为电站安全施工提供了高精度测量基准。The construction of the control network is an important benchmark of Pumped Storage Power Station civil construction,electrical and mechanical installation,Huizhou Pumped Storage Power Station construction period(which lasted seven years) must be regularly re-testing,to test its stability for the construction to provide a stable measurement accuracy.In this paper,the construction of Huizhou Pumped Storage Power control Network retest instance,using scientific methods,retest,the results of the original results of the comparison and analysis,the outcome is correct,stable,reliable,and provides highly accurate measurement of the power station construction safetybenchmarks.

关 键 词:抽水蓄能电站 施工控制网 精度 复测 

分 类 号:TV743[水利工程—水利水电工程] TU714[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象