检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]松辽水利水电开发有限责任公司,吉林长春130061 [2]中国水利水电第一工程局有限公司,吉林长春130062 [3]中国水利水电第六工程局有限公司,辽宁丹东118200
出 处:《东北水利水电》2012年第11期24-27,71,共4页Water Resources & Hydropower of Northeast China
摘 要:哈达山水利枢纽(一期)防护区工程,截渗墙是采用上部水泥土截渗墙和下部高喷截渗墙相结合的设计方案。两个墙体自身的质量和两个墙体之间的搭接是截渗墙质量的关键,施工前通过现场试验获得了详细的施工参数。施工过程中进行严格的质量控制,施工完成后通过质量检测,得出很好的结果。The design scheme of cut-off wall adopts the cut-off wall combined with cement soil in upper part and high pressure shotcrete in lower part in the Hadashan hydro-junction(phase I) protection area project.The own quality and the joined place of the two wall body is the key to the quality of cut-off wall.The detail construction parameter has been obtained by the field test in the pre-construction stage.The strict quality control is implemented in the process of construction and the quality detection is completed after the construction,which obtained good results.
分 类 号:TV543.188[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49