截渗墙工程施工质量控制  

Construction quality control of cut-off wall project

在线阅读下载全文

作  者:王平[1] 刘福成 张朝晖[3] 

机构地区:[1]松辽水利水电开发有限责任公司,吉林长春130061 [2]中国水利水电第一工程局有限公司,吉林长春130062 [3]中国水利水电第六工程局有限公司,辽宁丹东118200

出  处:《东北水利水电》2012年第11期24-27,71,共4页Water Resources & Hydropower of Northeast China

摘  要:哈达山水利枢纽(一期)防护区工程,截渗墙是采用上部水泥土截渗墙和下部高喷截渗墙相结合的设计方案。两个墙体自身的质量和两个墙体之间的搭接是截渗墙质量的关键,施工前通过现场试验获得了详细的施工参数。施工过程中进行严格的质量控制,施工完成后通过质量检测,得出很好的结果。The design scheme of cut-off wall adopts the cut-off wall combined with cement soil in upper part and high pressure shotcrete in lower part in the Hadashan hydro-junction(phase I) protection area project.The own quality and the joined place of the two wall body is the key to the quality of cut-off wall.The detail construction parameter has been obtained by the field test in the pre-construction stage.The strict quality control is implemented in the process of construction and the quality detection is completed after the construction,which obtained good results.

关 键 词:截渗墙 质量控制 哈达山水利枢纽 

分 类 号:TV543.188[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象