劲性钢筋混凝土梁柱节点施工技术  被引量:9

CONSTRUCTION TECHNIQUE OF RIGID REINFORCED CONCRETE BEAM-COLUMN NODE

在线阅读下载全文

作  者:李向东[1] 邢国荣[1] 安恺[1] 

机构地区:[1]北京建工集团有限责任公司,北京100055

出  处:《建筑技术》2012年第11期989-991,共3页Architecture Technology

摘  要:中国人寿研发中心F-05地块(数据中心)工程劲性钢筋混凝土梁柱节点钢筋密集,连接形式复杂。施工中通过节点优化和减少穿过钢结构钢筋数量,增加了钢构件的有效截面。通过采取多种钢筋与钢骨连接方法、控制焊接质量、加强管理措施,使施工质量得到了保障。In the China Life Center F-05 Block ( Data Center ) project, steel bars for rigid reinforced concrete beam-column node are dense and are connected in a complex form. During construction, effective section area of steel member is increased through optimization of node conservation and reduction of quantity of steel bars passing through steel structure. The construction quality is successfully ensured through adoption of multiple connection methods between steel bar and skeleton, control of welding quality and strengthening of management measures.

关 键 词:劲性钢筋混凝土 节点 优化 钢筋 钢骨 

分 类 号:TU755[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象