通钢新2号2680m^3高炉设计特点  

Designing Characteristic of New No. 2 Blast Furnace with 2 680 m^3 at Shougang Tonggang Steel Company

在线阅读下载全文

作  者:谢绍飞 

机构地区:[1]首钢通钢炼铁厂

出  处:《首钢科技》2012年第5期1-4,9,共5页Shougang Science and Technology

摘  要:通钢2680m^3高炉设计采用全冷却壁、砖壁合一薄壁炉衬、铜冷却壁、炭砖-陶瓷杯复合炉底、全软水密闭循环冷却系统、并罐无料钟炉顶、顶燃式热风炉等一系列先进实用技术,为实现高产、优质、低耗、长寿和环保的生产目标奠定了技术基础。A series of advanced and operative technologies were adopted in designing of No. 2 blast furnace with 2 680 m^3 in Shougang Tonggang steel company, such as whole cooling stave structure, thin skinned lining, copper cooling stave, carbon brick-ceramic cup complex bottom, closed loop soft water cooling system, paraUel type bell less top and top-combustion hot stove etc. Which established technical foundation for realizing the objects of high yield, high quality, low consuming, long life and environmental friendly production.

关 键 词:高炉设计 薄壁炉衬 铜冷却壁 无料钟炉顶 顶燃式热风炉 

分 类 号:TF572[冶金工程—钢铁冶金]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象