检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高贵荣[1] 毕炜[1] 杨北华 杨青[1] 张静[1] 王瑞红[1]
出 处:《内蒙古气象》2012年第5期33-35,共3页Meteorology Journal of Inner Mongolia
摘 要:为了便于开展冬季水泥混凝土施工气象服务,选用临河和海流图(乌拉特中旗)测站近10a的气象资料分别作为河套和后山地区的气象数据,选取逐日最高气温、最低气温、定时相对湿度、最小相对湿度、降水量、定时风速,经过筛选、统计、计算,得出河套地区水泥施工适宜时段为4月上旬末至10月中旬,后山地区水泥施工适宜时段为4月中旬末至10月上旬,这一研究结果可以提升冬季建筑施工气象服务的针对性和实用性。In order to carry out the weather service for the cement concrete construction in winter more facilitated, Hetao area uses the data of Linhe observation stations about nearly 10 years, and the back mountain region uses the data of Hailiutu observation stations nearly 10 years, using screen, statistics, calculate method to dispose the data of daily maximum temperature,minimum temperature, timing relative humidity, minimum relative humidity, annual rainfall and timing wind speed, the results were that the period for the cement concrete construction in Hetao area is early-April to mid-October, and the period for the cement concrete construction in back mountain region is mid-April to early October, it is useful for improving the pertinence and practical of the weather service for winter construction.
分 类 号:P429[天文地球—大气科学及气象学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.254.237