检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]新疆电力公司昌吉电业局,新疆昌吉831100 [2]新疆电力调度通信中心,新疆乌鲁木齐830002 [3]新疆吐哈油田公司,新疆鄯善838202
出 处:《水力发电》2012年第12期77-80,共4页Water Power
基 金:国家自然科学基金资助项目(50867004);863计划资助项目(2009AA05Z445)
摘 要:利用线路故障临界切除时间来表征电力系统暂态电压稳定性的量化指标,采取动态时域仿真法对WSCC3机9节点算例系统与基于直驱机组并网风电场接入该算例系统的暂态电压特性进行了仿真分析,研究结果表明,接入直驱机组风电场后算例系统的线路故障临界切除时间要比原算例系统的线路故障临界切除时间要长,因此,基于直驱机组风电场的接入算例系统能较好地改善原系统的暂态电压稳定性。The transient voltage stabilities of a three-synchronous-generator and nine-bus power grid integrated with or without Direct-driven Permanent Magnet Synchronous Generator (D-PMSG) are simulated by dynamic time-domain method and compared by taking the fault critical clearing time as the quantitative indicator of transient voltage stability of power system. The results show that the fault critical clearing time of grid integrated with D-PMSG is longer than the grid without D-PMSG, and so the integration of D-PMSG into grid can improve the stability of grid.
关 键 词:暂态电压稳定 直驱永磁风机 线路故障临界切除时间 风电场
分 类 号:TK83[动力工程及工程热物理—流体机械及工程] TM712[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249