检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:白朝能[1]
机构地区:[1]中铁二院工程集团有限责任公司,成都610031
出 处:《高速铁路技术》2012年第5期93-96,共4页High Speed Railway Technology
摘 要:针对目前我国大规模的新建和在建铁路所面临的难题——急需大量既懂设计又熟悉配合施工流程技术人员,笔者根据多年的工作经验,总结了配合施工的重要性,详细介绍了配合施工的主要任务,变更设计程序,配合施工注意事项,希望通过本文的介绍对初始从事配合施工的人员及各类工程参建人员能迅速熟悉配合施工工作,适应配合施工的需要,从而能快速、有序、优质高效的完成配合施工作,对从事设计配合施工的工程技术人员能够有所借鉴,对我国铁路建设配合施工工作能有所推动。One of the major problems we are facing now in railway engineering is woefully short of talented persons who have an intimate knowledge of design as well as of coordinated construction. Based on the experience accumulated in the past years, the author sums up the significance of coordinated construction in the respects of tasks, design procedure and points for attention in coordinated construction, hoping that by this article personnel initially engaged in coordinated con- struction and all other participators can be more familiar with and adaptable to the work so that coordinated construction is fulfilled fast, orderly and efficiently. It is also expected that the article may provide reference for engineers and technicians and give further impetus to coordinated construction in railway engineering.
分 类 号:U215.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117