检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国中铁二院成都地勘岩土有限责任公司,四川成都610031 [2]中国科学院成都山地灾害与环境研究所,四川成都610041
出 处:《中国铁道科学》2012年第B08期7-11,59,共6页China Railway Science
基 金:成都理工大学地质灾害防治与地质环境保护国家重点实验室开放基金资助项目(GZ2007-15);中国中铁二院科研项目
摘 要:采用室内模拟实验的方法,研究稀性泥石流拦挡坝坝高和沟床纵比降对坝后回淤坡度的影响,并对坝后泥石流淤积形态及坝前冲刷坑的深度和长度进行研究。模拟实验结果表明:沟床纵比降与回淤坡度成正相关关系,当沟床纵比降为12%,14%,16%,18%和20%时,对应的平均回淤坡度分别为8.08%,10.08%,11.88%,14.02%和15.63%;不同坝高条件下,回淤坡度随各沟床纵比降线性增长的幅度不同;坝高与回淤坡度成二次函数关系,沟床纵比降一定,回淤坡度随着坝高的增大,呈先增大后减小的趋势。实验结果可供坝后淤积模型试验研究、拦挡坝工程设计等参考。The influences of the height of diluted debris flow check dam and the longitudinal river slope on the slope of intercepted sediments behind the dam were studied by indoor simulation experiment. The con- figuration of intercepted sediments behind check dam as well as the length and depth of scour hole in front of the dam were also investigated. Simulation experiments show that, the relationship between longitudi- nal river slope and the slope of intercepted sediments behind the dam is positive correlation. As the longi- tudinal river slope is 12%, 14%, 16%, 18% and 20%, the corresponding average slope of intercepted sed- iments is 8.08%, 10.08%, 11.88%, 14.02% and 15.63% respectively. With different height of dam, the slope of intercepted sediments grows variably with the linear increase of each longitudinal river slope. The height of dam and the slope of intercepted sediments behind the dam are in quadratic function relation. When the longitudinal river slope is constant, the slope of intercepted sediments increases first and then decreases with the increase of the height of dam. The experiment results can provide references for check dam design and model experiment of intercepted sediments behind the dam.
分 类 号:P642.23[天文地球—工程地质学] U216.415[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.202