BIAS ERRORS INDUCED BY CONCENTRATION GRADIENT IN SEDIMENT-LADEN FLOW MEASUREMENT WITH PTV  被引量:1

BIAS ERRORS INDUCED BY CONCENTRATION GRADIENT IN SEDIMENT-LADEN FLOW MEASUREMENT WITH PTV

在线阅读下载全文

作  者:LI Dan-xun LIN Qiu-sheng ZHONG Qiang WANG Xing-kui 

机构地区:[1]State Key Laboratory of Hydroscience and Engineering,Tsinghua University,Beijing 100084,China

出  处:《Journal of Hydrodynamics》2012年第5期668-674,共7页水动力学研究与进展B辑(英文版)

基  金:supported by the National Natural Science Foundation of China(Grant No.50779023)

摘  要:Sediment-laden flow measurement with Particle Tracking Velocimetry (PTV) introduces a series of finite-sized sampling bins along the vertical of the flow. Instantaneous velocities are collected at each bin and a significantly large sample is established to evaluate mean and root mean square (rms) velocities of the flow. Due to the presence of concentration gradient, the established sample for the solid phase involves more data from the lower part of the sampling bin than from the upper part. The concentration effect causes bias errors in the measured mean and rms velocities when velocity varies across the bin. These bias errors are analyti- cally quantified in this study based on simplified linear velocity and concentration distributions. Typical bulk flow characteristics from sediment-laden flow measurements are used to demonstrate rough estimation of the error magnitude. Results indicate that the mean velocity is underestimated while the rms velocity is overestimated in the ensemble-averaged measurement. The extent of devia- tion is commensurate with the bin size and the rate of concentration gradient. Procedures are proposed to assist determining an appro- priate sampling bin size in certain error limits.Sediment-laden flow measurement with Particle Tracking Velocimetry (PTV) introduces a series of finite-sized sampling bins along the vertical of the flow. Instantaneous velocities are collected at each bin and a significantly large sample is established to evaluate mean and root mean square (rms) velocities of the flow. Due to the presence of concentration gradient, the established sample for the solid phase involves more data from the lower part of the sampling bin than from the upper part. The concentration effect causes bias errors in the measured mean and rms velocities when velocity varies across the bin. These bias errors are analyti- cally quantified in this study based on simplified linear velocity and concentration distributions. Typical bulk flow characteristics from sediment-laden flow measurements are used to demonstrate rough estimation of the error magnitude. Results indicate that the mean velocity is underestimated while the rms velocity is overestimated in the ensemble-averaged measurement. The extent of devia- tion is commensurate with the bin size and the rate of concentration gradient. Procedures are proposed to assist determining an appro- priate sampling bin size in certain error limits.

关 键 词:bias error VELOCITY CONCENTRATION GRADIENT 

分 类 号:P332.4[天文地球—水文科学] TK124[水利工程—水文学及水资源]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象