检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国南方电网超高压输电公司广州局,广州市510405 [2]北京市电力公司,北京市100031
出 处:《电力建设》2012年第11期11-13,共3页Electric Power Construction
摘 要:阀组状态转换自动顺序控制是直流控制系统的一项基本功能,阀组状态转换能否自动完成也是检验直流控制系统工作稳定性的重要指标。介绍了云广直流工程阀组状态转换的实现过程,分析了当前回路设计存在的不合理因素及其安全隐患,并提出了解决方法。该解决方法已成功应用到云广直流工程和糯扎渡直流工程中,对保证特高压直流系统的现场稳定运行具有积极作用。The automatic sequence control function of valve group state transition is one of the most basic control functions for DC system. The successful auto-completion of valve group state transition is also the important inspection index of working stability for DC control system. This paper introduced the implementation process of valve group state transition in Yunnan-Guangdong DC transmission project, analyzed the irrationality of current circuit's design and its hidden danger. The solution method proposed has been successfully applied in Yunnan-Guangdong and Nuozhadu DC transmission projects, which has certain practical significance to the steady operation of UHVDC systems.
关 键 词:阀组状态转换 自动顺序控制 直流控制系统 云广直流工程
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3