检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国南方电网超高压输电公司贵阳局,贵阳550003 [2]荣信电力电子股份有限公司,辽宁鞍山114051
出 处:《电气技术》2012年第11期26-30,共5页Electrical Engineering
摘 要:本文主要针对除常规一次设备的试验外,初步介绍融冰装置的大电流试验、直流装置启停试验、空载升压试验等的试验步骤、基本试验方法,通过对现场试验结果的录波图、红外测温图及现场操作情况介绍,全过程描述现场试验内容,进而得出合理、真实的试验结论。Recently, the CSG begins to put into operation of DC ice-melting device in the large-scale, the line melting ice has been achieved good efforts. Before the device of DC ice-melting be put into operation, the field test must be made. Except the conventional primary equipment experimental, there are initial introduction to the current test, starting and stopping test, no loading pressure test of DC devices of procedure, and other test methods. After the whole description of waveform of the field test results, the infrared temperature maps and field operating conditions, it comes to the reasonable and real conclusion of the experiment.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249