检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张伟民[1] 谭立海[1] 张克存[1] 安志山[1] 张国彬[2] 邱飞[2] 詹鸿涛[2]
机构地区:[1]中国科学院寒区旱区环境与工程研究所敦煌戈壁荒漠研究站,甘肃兰州730000 [2]敦煌研究院保护研究所,甘肃敦煌7362000
出 处:《地理科学》2012年第11期1370-1376,共7页Scientia Geographica Sinica
基 金:中国科学识创新过程重要方向项目(KZCX2-EW-313);国家自然科学基金项目(40671022);敦煌研究院重点科研基地开放课题(200911)资助
摘 要:野外风洞实验表明,砾石床面具有捕沙和过沙的双重功能,砾石床面的输、阻性质是不同覆盖度与风动力耦合的结果。当砾石盖度小于20%时,床面基本以风蚀作用为主;当砾石覆盖度在30%~50%时,低风速条件下(<10 m/s),床面以强烈风积作用为主,高风速条件下(>12 m/s),床面以强烈风蚀为主,其间[(10~12)m/s]床面趋于蚀积平衡状态;当砾石覆盖度大于60%时,随着风速的增大,床面蚀积量变化不大。研究结果可应用于莫高窟顶沙砾质戈壁的风沙防治,为风沙工程增添新的思路和新技术。Results of field wind tunnel simulation reveal that gravel beds exist three types of states: aeolian erosion, balance of aeolian erosion and deposition, aeolian deposition. Under certain wind velocity, there is a type of gravel bed reaching the balance. At this time, sand accumulation is saturated. Processes of aeolian erosion and deposition can be fitted by a polynomial function, which can be usedto predict the changing process of sand accumulation of gravel beds with different coverage. Gravel beds have dual function of sand trapping and transporting. Properties of erosion a^d deposition of gravel beds are the results of the coupling of gravel cover- age and the impetus of wind. Gravel beds are mainly eroding when gravel coverage is below 20%; gravel beds are mainly intensively depositing under low wind velocities (〈 10 m/s), while under high wind speeds (〉 12 m/s) gravel beds change into eroding intensively. Aeolian erosion and deposition balance approximately be- tween wind velocities with 10-12 m/s. When gravel coverage is larger than 60%, with increasing wind veloci- ty, aeolian erosion and deposition amount of gravel beds changes little. The ratio of gravel space to height (SJ H) and the airflow property are main factors influencing on erosion/deposition state of gravel beds. When the value of SJHranges from 5 to 3, the airflow of gravel beds is isolated roughness flow, and gravel beds are erod- ing or intensively eroding. When the value of Sill ranges from 3 to 1, the airflow of gravel beds is wake coher- ence flow, and gravel beds are intensively depositing or intensively eroding. When the value of SJH is smaller than 1, the airflow of gravel beds is boating flow. Because of the wind-blocking effect the gravel beds are de- positing, balance between depositing and eroding or eroding. These results can be applied to the wind-blown sand control projects at the top of Mogao Grottoes. The artificial gravel surface with a coverage of 30% is ide- al both in sand trapping and depositing, thereb
关 键 词:砾石床面 供沙条件 积沙量变化过程 野外风洞实验
分 类 号:P931.3[天文地球—自然地理学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249