地下厂房机组安装高程的确定及影响  

The Selection and Influence of Turbine Installation Elevation for Underground Power Station

在线阅读下载全文

作  者:杨建东[1] 陈鉴治[1] 赖旭[1] 

机构地区:[1]武汉水利电力大学,武汉430072

出  处:《水力发电学报》2000年第1期86-91,共6页Journal of Hydroelectric Engineering

基  金:国家自然科学基金! (编号 596790 0 7);国家电力公司"九五"重点攻关 !(编号 95- 2 2 1- 0 5- 0 3-0 4 )资助项目

摘  要:地下厂房机组安装高程不仅取决于水轮机的吸出高 ,而且取决于水电站水力过渡过程有关的参数 ,甚至对导叶关闭规律的优化、洞室间距的确定、以及调压井型式和尺寸的选取有着重要的影响。本文在阐明上述关系的基础上 ,从水轮机的基本理论和工程实际出发 ,提出地下厂房机组安装高程设计的基本思路和具体步骤 。The installation elevation of turbine is not only dependent on the suction height of turbine, but also decided by large transient conditions in underground power station. Whether heigh or low, the installation elevation will give effect to the optimization of wicket operation rule, to the decision of underground structures interval, and to the selection of surge tank type and size. The paper has analysed these interactions, suggested the design procedure for the installation elevation of turbine, and applied the procedure to the design of two large underground power stations.

关 键 词:地下厂房 机组 安装高程 水轮机 水电站 

分 类 号:TV547.3[水利工程—水利水电工程] TV734

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象