机构地区:[1]中国三峡总公司建设部厂坝项目部
出 处:《中国三峡建设》2000年第7期12-15,共4页China Three Gorges Construction
摘 要:左岸电站厂房是三峡工程发电的关键项目 ,结构复杂 ,工程量大 ,施工难度大。参建各方根据厂房混凝土的结构特点与施工难点、采用高架门机为主、中小型门机为辅的混凝土施工方案 ,狠抓关键部位混凝土施工技术及温控措施 。The left powerhouse at the Three Gorges project is the key works for power generation as a result of its complexity in structure, huge amount of workload and difficulty in construction. In view of the concrete structural features and construction difficulties of the powerhouse, contractors have made a concrete construction arrangement including mainly overhead cranes supported with medium and small-sized gantry cranes, and employed the concrete construction techniques and taken the temperature control measures to the key locations so as to ensure that the construction progress and quality can match the contractual requirements.
分 类 号:TU755[建筑科学—建筑技术科学] TU271.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15