检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何光同[1]
机构地区:[1]福建省水利水电勘测设计研究院,福建福州350001
出 处:《水利水电科技进展》2000年第3期38-40,共3页Advances in Science and Technology of Water Resources
摘 要:针对混凝土面板堆石坝坝顶溢流的关键技术难题 ,通过大量变形实测资料的统计 ,用变形条件不利的工程实例分析变形特性对其上部结构 ,包括挡水闸门、泄洪建筑物、渗漏排水等因素的影响 ,提出相应的对策和工程措施 ,并进一步对造价和工期进行剖析 ,认为混凝土面板堆石坝坝顶溢流技术上可行 。This paper focuses on the key and difficult technical problem of crest overflow of concrete faced rockfill dams(CFRD).Through a large number of statistics of recorded deformation data and analysis of deformation features under unfavourable deformation condition and it impact on upper structure performance,including the effects on water retaining sluice gate,flood relief structure,drainage structures etc.Some engineering measures are put forward,and the cost and the period of construction are analysed.Finally,it is concluded that the crest overflow sheme of CFRD is technically feasible and the economic benefit is remarkable.
分 类 号:TV641.43[水利工程—水利水电工程] TV651.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15