泄洪表孔宽尾墩加消力池联合消能工的应用  被引量:4

Application of composite energy dissipation system of stilling basin with flaring gate pier of surface outlet

在线阅读下载全文

作  者:周赤[1] 郭均立[1] 芦俊英[1] 廖宁[1] 

机构地区:[1]长江科学院水工研究所,湖北武汉430010

出  处:《长江科学院院报》2000年第4期1-4,7,共5页Journal of Changjiang River Scientific Research Institute

摘  要:通过对已建的一些采用表孔宽尾墩加消力池的重力坝调研资料及理论分析 ,表明宽尾墩可增加水流的三维特性 ,降低形成水跃的第二临界水深 ,从而可以使消力池底板抬高、池长缩短。因此 。Through investigating the prototype materials and theoretical analyses of some completed gravity dams in which the composite energy dissipation systems of stilling basins with flaring gate piers of the surface outlets have been adopted,the study results show that the flaring gate piers can play the roles of increasing the three dimension character of water jet ,decreasing the secondary conjugate depth of water jump,and thus the basin floor can be made higher and its length shorter.It is recommended that this kind of energy dissipation system may be used for the Zhaoshi Project.

关 键 词:表孔宽尾墩 消力池 泄洪消能 水电站 

分 类 号:TV653[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象