综放工作面采前顶板弱化技术研究  被引量:10

Research on weakening technology for pre-mining roof in fully-mechanized caving face

在线阅读下载全文

作  者:崔树江[1,2] 张百胜[3] 

机构地区:[1]中国矿业大学(北京)资源与安全工程学院,北京市海淀区100083 [2]潞安矿业集团生产处,山西省长治市046102 [3]太原理工大学矿业工程学院,山西省太原市030024

出  处:《中国煤炭》2012年第11期41-43,共3页China Coal

摘  要:常村矿3#煤层基本顶致密坚硬,回采初期不易垮落,针对S6-2工作面采用开切眼深孔预裂爆破、预先破坏开切眼顶板的完整性、缩小顶板初次垮落步距的方法,对综放工作面进行采前顶板弱化处理。实践表明,该方法不但解决了大面积顶板来压隐患,也可以提前回收顶煤,实现综放工作面安全高效开采。The basic roof of No. 3 coal seam in Changcun Mine is dense and hard, and it is not easy to collapse in initial stage of mining. In order to solve this problem, the weakening tech- nology for pre-mining roof is conducted in S6-2 working face by adopting the method of deep-hole presplit blasting with starting cut to break the integrity of the roof and to shorten the interval of initial collapse of the roof. The practice result shows that the hazard of large area roof pressure is prevented, and the top coal recovery can be done in advance, and the safe and efficient mining in the fully-mechanized caving face is realized.

关 键 词:综放工作面 坚硬顶板 顶板弱化 

分 类 号:TD327[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象