检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金珍宏[1]
机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014
出 处:《水利水电技术》2012年第11期34-36,共3页Water Resources and Hydropower Engineering
摘 要:白鹤滩水电站施工期能耗分析涉及到主体及临建工程施工、施工辅助生产系统、施工临时建筑、施工管理区及工程建设生活区等项目的主要用能设备、能耗种类、能耗分布点、负荷水平。文中提出了单位工程量(产品)能耗、能耗总量及分年度能耗量的分析方法,为大中型水电站能耗分析提供设计借鉴。The analysis on the energy consumption during the construction of Baihetan Hydropower Station is related to the con- struction of the main project and its temporary works, auxiliary construction system, temporary buildings for construction, construc- tion management area, living quarters for construction, etc. , which includes the main energy consumption equipment, classification of energy consumption, distribution points of energy consumption and load levels. The method for analysis on the unit consumption of energy for construction work quantity, the total energy consumption and the annual energy consumption is put forward herein, so as to provide a reference for the design of the energy consumption analysis for those large-medium sized hydropower stations.
分 类 号:TV51[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117