检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学土木与建筑学院,湖北宜昌443002
出 处:《水利水电技术》2012年第11期41-43,共3页Water Resources and Hydropower Engineering
基 金:"十一五"国家科技支撑计划项目(2008BAB29B03);国家自然科学基金资助项目(50909052;51079077)
摘 要:在我国西南地区,高边坡问题几乎成了重大工程建设的首要工程地质和岩土工程问题。本文结合有关自然河谷高边坡发育的三个阶段理论,对如美水电站工区高边坡的演化进行动力学分析,并通过地质调查验证了其分析结果的合理性,进而运用到了实际工程。In the Southwest China, the problem from high slope almost becomes the most important engineering geological and geotechnical problem. In accordance with the relevant theory of three-stage development of high natural valley, a dynamic analysis is made on the evolvement of the high steep slope within the construction site of Rumei Hydropower Station, and then the rational- ity of the analysis is demonstrated through the geological investigation concerned and the study result is applied to the actual con- struction proiect as well.
分 类 号:P642.22[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.15.238.90