作 者:张正风[1]
机构地区:[1]徐州生物工程职业技术学院信息中心,江苏徐州221006
出 处:《软件导刊》2012年第12期24-25,共2页Software Guide
摘 要:讨论了依照CMM3级要求对软件过程进行裁剪的方法。裁剪后的软件过程包括:选择迭代增量型与瀑布模型结合软件周期模型、项目总体计划包含的内容与制定方法、过程数据的采集方式、SCM、SQA活动方式等。讨论了执行该软件过程时的效果与不足。Recently, the Software Engineering Laboratory where I was a university digital teaching resource platform development, I served as the project manager, systems analyst concurrently. In this paper, the system to discuss the the cutting software process in accordance with the requirements of CMM3 level. The platform is a development time of 2 years, the software developer for 6 middle development scale projects. Laboratory designated as the CMM3 pilot project, in accordance with the characteristics of the project, I CMM3 were cutting requirements of the project, including the cropped software process.. Select the iterative incremental waterfall model combines the software cycle model; project team from the systems engineering group, a software engineering group, SQA group, SCM group, the system test group; overall project plan contains the content and methods of formulation, the process of data collection, the SCM, SQA activities way. The paper concludes by discussing the effects and lack of execution of the software process.
分 类 号:TP301[自动化与计算机技术—计算机系统结构]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15