检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谢颖达[1] 刘舒然[1] 欧传奇[2] 刘德有[1,2]
机构地区:[1]河海大学能源与电气学院,江苏南京210098 [2]国际小水电中心,浙江杭州310002
出 处:《水电能源科学》2012年第12期205-208,共4页Water Resources and Power
基 金:国家"十一五"科技支撑计划基金资助重大项目(2006BAA01A24)
摘 要:针对风电场平均风速的时距取值与风电机组出力对风速的实际响应时间不匹配的问题,基于风机功率曲线、风电场风速测量及风电机组出力特性,分析了风电场测风频率与风机出力特性的匹配程度及不同的平均风速时距取值对风电场出力计算结果的影响,提出了平均风速时距合理取值的建议。In order to solve the problem that the selection value of average wind speed time interval of wind farm is not matched with the actual response time of wind power output, based on wind power curve, wind speed measurement and characteristics of wind power output, this paper not only analyzes the matching degree between the frequency of wind speed measurement and the characteristics of wind power output but also studies the impact of different average wind speed time intervals on wind power output. Finally, the suggestion of reasonable average wind speed time interval is given.
分 类 号:TK89[动力工程及工程热物理—流体机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.209.210