检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黄河勘测规划设计有限公司,河南郑州450003 [2]国家投资项目评审中心,北京100037
出 处:《水利经济》2012年第6期65-68,72,共4页Journal of Economics of Water Resources
摘 要:针对公路建设和大中型水利工程建设征收土地的特点、征收土地补偿补助政策和有关费用,以案例形式分析两者在费用上的区别,提出了不同类型的建设项目在土地补偿补助标准和税费标准方面应执行相同政策、提高大中型水利工程土地补偿补助标准、降低耕地占用税标准的建议,供征地拆迁补偿政策修订时参考。With regard to the characteristics of land expropriation,the polices of land compensation and resettlement subsidy and the relevant taxes and fees between highway projects and large and medium-scaled water resources projects,their differences of taxes and fees are analyzed through case studies.Some suggestions are put forward that the same polices for the standards of land compensation and resettlement subsidy and the relevant taxes and fees should be implemented for different kinds of projects,the standards of land compensation and resettlement subsidy for the large and medium-scaled water resources projects should be improved,and the standards of cultivated land occupation fees should be reduced.It may be taken as references for the future modification of the relevant policies for land expropriation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145