邯长线扩能改造方案分析研究  被引量:1

Analysis and Research of Hanchangxian Revamping Scheme

在线阅读下载全文

作  者:高颖[1] 

机构地区:[1]铁道第三勘察设计院集团有限公司线站处,天津300142

出  处:《铁路工程造价管理》2012年第6期1-3,25,共4页Railway Engineering Cost Management

摘  要:既有邯长线1984年初全线建成开通,由于线路技术标准低,年运输能力小,1999—2001年进行了一次扩能改造,但仍满足不了晋煤外运的需要,需再次进行扩能改造。此文根据邯长线的地形地貌特点,对全线电气化改造方案、部分列车牵引5 000 t延长车站到发线方案、局部区段增建二线和新建双线取值方案进行分析与研究,经过论证和投资比较,扩能改造确定采用全线电气化、部分列车牵引5 000 t和9个车站到发线延长1 050 m、分段增建二线及线路坡度维持既有不变的方案。Hanchangxian built and open in early 1984. Because the line technical standard is low and the transpor- tation capacity is small, it had been revamped in1999 -2001, but it still can't satisfy the need of the Shanxi coal transportation. Therefore, it needs to make another revamping. In terms of topography and geomorphology characteristics of Hanchangxian, the schemes of electrification transformation, the part of the train traction 5000 t prolong the station departure line, local section added second line and new dual line value are analyzed and researched. Through discussion and investment comparison, the schemes of the revamping full electrification, part of the train traction 5000 t and 9 station departure line extension 1050 m, section added second line and the line slope maintains the same are confirmed.

关 键 词:邯长线 扩能改造 方案研究 

分 类 号:U218[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象