泸定水电站2号泄洪洞事故闸门设计研究  被引量:1

Research on the Design of Emergency Gate to 2# Spillway Tunnel of Luding Hydropower Station

在线阅读下载全文

作  者:余迎宾[1] 姚汉光[2] 蒋德成[1] 

机构地区:[1]中国水电顾问集团成都勘测设计研究院,成都610072 [2]中国三峡集团公司溪洛渡工程建设部,云南永善657300

出  处:《中国农村水利水电》2012年第12期158-160,163,共4页China Rural Water and Hydropower

摘  要:就泸定水电站2号泄洪洞事故闸门的结构设计、启闭机形式及容量的选择、门槽体型及动水闭门特性等问题进行论述。通过技术、经济等多方面综合比较分析,事故闸门采用上游止水、滚子轴承定轮支承、利用加重闭门的平面定轮闸门。该研究成果可供类似工程设计参考。This paper introduces the structural design of emergency gate to 2 spillway tunnel of Luding Hydropower Station, the option of model type and capacity of Hoist, somatotypes of gate slot and characters of dynamic water closed door. Through the comprehensive comparative analysis of technical, economic and other aspects, the emergency gate adopts fixed wheel plane gate which can use upstream to retain water and is sustained by the roller shaft bearing fixed wheel and increase the weight of close gate. The re- sults function as a valuable reference for the design of similar projects.

关 键 词:双向变截面 泄洪洞 事故闸门 三维有限元 底缘设计 

分 类 号:TU311.1[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象