检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何镁
机构地区:[1]北京市建筑工程设计有限责任公司,北京100055
出 处:《工程建设与设计》2012年第12期123-126,共4页Construction & Design for Engineering
摘 要:河北保定电谷大厦是保定当地政府支持的一个节能项目工程,该工程空调形式采用水环热泵。论文主要介绍设计此大厦空调系统的过程以及在设计过程中发现及解决的一些技术问题。衡量设计合理的标准不光是单一满足建筑物的使用功能,更应尽可能多考虑建筑在使用后的能耗。在实际工程设计中,结合实际条件做到空调、通风系统的合理设计。Power Valley Tower in Baoding Hebei is an energy saving project supported by B aoding local government,air conditioning from with water loop heat pump.This paper mainly introduces the design process of air conditioning system in this building,in which discovering and solving some technical problems.The standard measuring design is reasonable or not,is not only meet the use of building function,but also consider building energy consumption after use as far as possible. We should design air conditioning and ventilation system reasonably combining with actual conditions in actual engineering design o
分 类 号:TU831.3[建筑科学—供热、供燃气、通风及空调工程] TU972.8
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15