综合超前地质预报技术在马桑哨隧道中的应用研究  被引量:11

COMPREHENSIVE GEOLOGY PREDICTION FOR MASANGSHAO TUNNELLING IN KARST ZONE

在线阅读下载全文

作  者:雷春英[1] 尚亿军[1] 李晓虎[1] 赵利坤[1] 

机构地区:[1]武汉理工大学资源与环境工程学院,武汉430070

出  处:《工程地质学报》2012年第6期1007-1012,共6页Journal of Engineering Geology

基  金:国家"十二五"科技支撑计划重点项目(2011BAB05B03)

摘  要:马桑哨隧道通过地段岩溶发育、水流量大、断层破碎带多,地质条件十分复杂。施工过程中采用了包括TSP203、地质雷达、地面调查、地质素描和超前水平钻孔多种方法相互印证、相互补充的综合地质预报技术。以马桑哨隧道超前地质预报为例,通过开挖后揭示的信息与预报结果对照,表明了综合超前地质预报的准确性。对类似工程的超前地质预报工作具有一定的指导和借鉴意义。The Masangshao tunnel passes through a section with complicated geological condition. The ground is rich in karst and underground water, and has many faults and fractured zones. In the process of construction, a comprehensive geological prediction was adopted. It included the TSP203, geologic radar, regular geologic analysis and advance horizontal boring. They verify and supplement one another. The paper compares the geological predic- tion of Masangshao tunnel with the information revealed after excavation. This comparison shows the accuracy of comprehensive geological prediction. The above-mentioned practice has certain lessons and guiding significance to geological prediction of similar projects.

关 键 词:马桑哨隧道 TSP 地质雷达 综合超前地质预报 

分 类 号:TU472.5[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象