检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国电南京自动化股份有限公司,江苏南京211100
出 处:《电力系统通信》2012年第11期47-50,共4页Telecommunications for Electric Power System
摘 要:分析了目前变电站监控系统中已有的合并遥信计算方法,对目前存在的合并遥信的计算方案进行改善,提出一种新的基于多叉树结构的合并遥信计算方法,计算过程采用短路计算,并根据每个参与量的权重及时对多叉树结构进行优化,并扩展新的应用,提高计算效率和满足用户的应用需求,同时给出了实现该方案的数据结构、数据存储的C语言描述,及程序实现的流程描述。Through analyzing the existing merger telesignalisation calculation method in the monitoring system of power substation, this paper improves the existing merger telesignalisation calculation program, proposes a new method based on multi-tree structure. The calculation process of new method uses the short circuit calculation. And the new method optimizes the structure of multi-tree according to the weight of each participating variation, expands the new application, improves the computational efficiency and meets the application needs of users. At the same time this paper gives the data structure of new program, data storage with C language description, and the process description of new program.
分 类 号:TM764.2[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28