检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马安利[1]
机构地区:[1]黄河上中游管理局,西安710021
出 处:《水土保持研究》2012年第6期68-71,共4页Research of Soil and Water Conservation
基 金:水利部公益性行业科研专项项目"小流域坝系监测评价技术研究"(200701042)
摘 要:黄河流域第三副区聂家河小流域坝系工程布局以现有骨干工程为骨架,各级沟道自上而下逐段布设小型淤地坝、中型淤地坝和骨干工程,分级拦蓄径流泥沙;在其示范坝系的典型淤地坝上布设了降雨、拦沙及输沙监测点。监测结果表明:坝系工程抬高了侵蚀基准,稳定了沟坡,控制了沟床下切和沟岸扩张,增强保土保水能力,尤其骨干坝在坝系拦沙中起关键作用,能够快速有效地拦蓄径流泥沙,控制水土流失,是水土保持生态建设的重要措施,为保护下游河流安全起到了重要作用。The layout of dam system project in Niejiahe Watershed took the existing key projects as skeleton.All levels of channel laid small and medium warping dams and key projects from upstream to downstream,as well as emplaced rainfall,sediment retaining and transport monitoring sites in its typical warping dam of demonstration dam system.The monitoring results showed that dam system raised the erosion baseline,stabilized the gully,controlled gully bed scour and gully bank expansion,and enhanced soil and water conservation capacity,so that the project could block sand,control soil erosion,protect farmland,and reduce sediment into the Yellow River effectively,which played an important role in ensuring the safety of downstream river.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.212