检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]College of Information Science and Technology,Beijing University of Chemical Technology
出 处:《Chinese Journal of Chemical Engineering》2012年第6期1059-1066,共8页中国化学工程学报(英文版)
摘 要:In this paper, a novel approach termed process goose queue (PGQ) is suggested to deal with real-time optimization (RTO) of chemical plants. Taking advantage of the ad-hoc structure of PGQ which imitates biologic nature of flying wild geese, a chemical plant optimization problem can be re-formulated as a combination of a multi-layer PGQ and a PGQ-Objective according to the relationship among process variables involved in the objective and constraints. Subsequently, chemical plant RTO solutions are converted into coordination issues among PGQs which could be dealt with in a novel way. Accordingly, theoretical definitions, adjustment rule and implementing procedures associated with the approach are explicitly introduced together with corresponding enabling algorithms. Finally, an exemplary chemical plant is employed to demonstrate the feasibility and validity of the contribution.In this paper, a novel approach termed process goose queue (PGQ) is suggested to deal with real-time optimization (RTO) of chemical plants. Taking advantage of the ad-hoc structure of PGQ which imitates biologic nature of flying wild geese, a chemical plant optimization problem can be re-formulated as a combination of a multi-layer PGQ and a PGQ-Objective according to the relationship among process variables involved in the objective and constraints. Subsequently, chemical plant RTO solutions are converted into coordination issues among PGQs which could be dealt with in a novel way. Accordingly, theoretical definitions, adjustment rule and implementing procedures associated with the approach are explicitly introduced together with corresponding enabling algorithms. Finally, an exemplary chemical plant is employed to demonstrate the feasibility and validity of the contribution.
关 键 词:real-time optimization chemical plants process goose queue multi-layer process goose queue
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145