某30万吨铜选矿厂带负荷试车工艺技术指标分析  被引量:1

Technical Indexes Analysis for On-load Commissioning of New Copper Concentrator

在线阅读下载全文

作  者:魏有林[1] 秦彩霞[1] 刘千帆 

机构地区:[1]酒钢集团宏兴股份公司选烧厂,甘肃嘉峪关735100

出  处:《矿冶工程》2012年第6期54-57,共4页Mining and Metallurgical Engineering

摘  要:对某新建30万吨铜选矿厂带负荷试车后的技术指标进行了分析,通过对技术指标的分析,判别该选厂工艺流程、工艺设备能否满足设计指标,发现试车过程中存在的问题及解决方法,为选矿厂投产后达产达标提供依据。Technical indexes obtained from the on-load commissioning of a newly constructed copper concentrator with annual capacity of 300 000 ton were analyzed.Based on the analysis,the process flowsheet and the equipment selection were evaluated according to the design parameters.In terms of problems existed in the commissioning,some corresponding solutions were proposed,which would provide a reference after the concentrator is put into practical production in the real operation.

关 键 词:铜选矿厂 负荷试车 技术指标 尾矿干排 

分 类 号:TD92[矿业工程—选矿]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象