作 者:曹毅
机构地区:[1]中国水电八局,长沙410007
出 处:《建材世界》2012年第6期92-95,共4页The World of Building Materials
摘 要:溪洛渡水电站工程高线砼系统布置在大坝右坝肩下游,其骨料储运系统布置在下游EL.705平台地面以下山体中,共布置有粗骨料竖井4个、细骨料竖井2个,竖井深度55~77m。该项目成功采用液压滑模技术进行大高差、薄壁井筒骨料竖井混凝土衬砌施工,具有施工速度快、质量高、成本低、安全有保障的特点。Altitude concrete system of Xiluodu hydropower station project was arranged in the downstream of right dame abutment,and its aggregate storage and transportation system was arranged in mountain body under the dowstream EL. 705 platform. There were 4 coarse aggregate shafts and 2 fine aggregate shafts with depth of 55-77 m. This project successfully adopted hydraulic sliding model technology to carry out concrete lining construction of the large elevation difference thin-wall aggregate shafts with characteristics of rapid construction, high quality, low cost, safety.
关 键 词:溪洛渡水电站 骨料竖井 混凝土衬砌 液压滑模技术
分 类 号:TV544[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143