检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王东君[1]
机构地区:[1]东北电力设计院,长春130021
出 处:《工业技术经济》2012年第12期81-85,共5页Journal of Industrial Technological Economics
摘 要:本文针对以煤炭为主要消耗能源的热电厂面临的能源短缺,价格上涨,环境保护等一系列严峻的市场形势,以及热电厂建设项目投资额大,风险高,利益和风险共存等特点,提出了对此类项目的概预算进行研究,实施有效的概预算控制的必要性,介绍了项目概预算的相关理论,列举了热电厂建设项目的组成,并将概预算在执行过程中产生的差异因素进行分析,提出了相应的改进措施。The thermal power plant of coal as the main energy-consuming faces a series of tough market conditions,such as energy shortage,rising price,environmental protection.As well as thermal power plant construction project faces a large investment,high risk,the benefits and risks,this paper proposes the study about project budget and the necessity of implementation effective budget control,and introduces the theory of the budget items that cited the composition of the thermal power plant construction projects,and analyzes the differences in factors of the budget implementation process.Then this paper gives some corresponding improvement measures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117