检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王国海
机构地区:[1]水力发电设备国家重点实验室,哈尔滨150040
出 处:《大电机技术》2012年第6期40-43,共4页Large Electric Machine and Hydraulic Turbine
摘 要:大型转轮运输难题的日益突出并且一些新建水电站远离交通运输路线,这些都导致了整体制造的大型转轮无法直接运送到工地。因此大型水轮机转轮工地加工已经成为一种趋势,在此情况下工地加工转轮的一些相关技术也应运而生。本文在总结多年来哈尔滨电机厂有限责任公司(以下简称为哈电公司)工地现场制造转轮经验的基础上,以景洪、构皮滩、龙头石三个电站现场制造水轮机转轮的工程实践为背景,对工地制造转轮中的一些工艺方案进行了探讨并就所涉及的相关技术进行了简述。At present, the problem of transportation of large turbine runner has become increasingly prominent. Some new hydropower stations are so far away from the transport routes that it is impossible to send a large integrated runner to the power station. So site manufacturing of runner has become popular and related technologies of runner's site manufacturing appeared. Based on many years of site manufacturing experiences of Harbin Electric Machinery Company Limited (hereinafter referred to as HEC), considering the engineering, practice of runner's site manufacturing of three hydropower stations of Jing Hong, Gou Pi Tan, Long Shi Tou, this paper shows some methods and technologies of runner site manufacturing.
分 类 号:TK730.6[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.42