MBBR工艺用于青岛李村河污水处理厂升级改造  被引量:31

Application of MBBR Process in Upgrading and Reconstruction of Licunhe WWTP in Qingdao City

在线阅读下载全文

作  者:孟涛[1] 刘杰[1] 杨超[1] 余鹏[1] 

机构地区:[1]中国市政工程华北设计研究总院,天津300074

出  处:《中国给水排水》2013年第2期59-61,共3页China Water & Wastewater

摘  要:青岛市李村河污水处理厂的升级改造工程规模为17×104m3/d,在综合分析污水厂现有工艺、占地、进出水指标及运行情况的基础上,升级改造的生物处理工艺采用投加悬浮填料工艺(MBBR工艺),实施改造后出水水质稳定达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准。The design capacity of the upgrading and reconstruction project of Licunhe WWTP, Qingdao City was 17 x 10^4 m3/d. Based on the comprehensive analysis of the existing process, occupa tion space, influent and effluent indexes and operation situation of the WWTP, the MBBR process was designed to be used in the upgrading and reconstruction project. After the reconstruction, the effluent quality met the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 2002).

关 键 词:污水处理厂 升级改造 MBBR 

分 类 号:X703.1[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象