检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《西北水电》2012年第6期94-96,100,共4页Northwest Hydropower
摘 要:针对喜河水电站中孔闸门在投运初期因充压式水封效果较差导致闸门漏水的现象,客观地分析了中孔闸门止水设计及安装环节存在的问题,提出了中孔工作闸门止水的改造方案。经运行验证:水封的改造是成功的。Aiming at leakage from the middle-outlet gate due to the pressurized sealing with poor effect in the initial operation period of Xihe Hydropower Station, issues on design and installation of waterstop for the middle-outlet service gate of Xihe Hydropower Station are objectively analyzed as well as scheme for rehabilitation of the waterstop for the middle-outlet service gate is provided. The sealing rehabilitation is proved successful through its operation.
分 类 号:TV663[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222