检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]中国水电顾问集团华东勘测设计研究院,浙江杭州310014
出 处:《水电能源科学》2013年第1期111-114,共4页Water Resources and Power
摘 要:洪屏抽水蓄能电站地下厂房地质条件复杂,洞室较多,为检验现有的防渗排水措施的预期渗控效果,利用改进的节点虚流量法求解有自由面的无压渗流问题,采用改进的排水子结构法模拟排水孔,通过计算正常运行工况、降雨入渗、改变排水孔间距等控制性因素,分析了不同条件下地下厂房渗流场的工作状态。结果表明,现有的防渗排水系统合理,可达到预期渗控效果。The geological condition of underground powerhouse of Hongping pumped storage power station is complex and it has many chambers. In order to check the effect of seepage control and drainage, improved nodal virtual flux meth od is used to solve the unconfined seepage problems with free surface. The technique of improved drainage substructure is adopted to simulate drainage holes. The seepage field of powerhouse is analyzed by calculating the normal operation condi- tions, rainfall infiltration and changing the interval of drainage holes. The results show that the existing anti-seepage and drainage system is reasonable, which can achieve the desired effect.
关 键 词:洪屏抽水蓄能电站 地下厂房洞室群 渗控措施 排水孔幕 效果评价
分 类 号:TV731[水利工程—水利水电工程] TV743
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28