Kitting物料配送在混流装配线的应用研究  被引量:3

Kitting of Material Delivery in Mixed Model Assembly Line Application

在线阅读下载全文

作  者:希志明 薛冬娟[1] 高娟[1] 邓黎明[1] 

机构地区:[1]大连海洋大学机械与动力工程学院,辽宁大连110623

出  处:《装备制造技术》2013年第1期105-107,共3页Equipment Manufacturing Technology

基  金:国家科技支撑计划项目"大连市装备制造业信息化关键技术研发及综合集成应用示范"(2013BAF02B03);辽宁省教育厅项目"船舶总组与搭载制造过程监控与管理方法研究"(X100604)

摘  要:对混流装配过程中由物料配送不及时引起的生产计划不连续的问题进行了研究,在分析了混流装配生产模式后,构造出了在该生产模式下的混流装配线线旁物料kitting(齐套性)算法,再根据物料kitting(齐套性)算法预求出混流装配线各个工艺点物料消耗,在此基础上求出各个工艺点物料需求,从而带动物料配送;最后通过实例,验证上述方法的可行性和实用性。Discontinuous problem of production plan in assembly process which was caused by the delayed material delivery was studied in this paper, and the material kitting algorithm of mixed-model assembly line was constructed after mixed assembly production mode being analyzed. Material consumption of each process points in mixed flow assembly line was determined in advance based on the material kitting algorithm and thereby pulling the material distribution. At last, an example was used to verify the feasibility and practicability of the method.

关 键 词:混流装配过程 齐套性 物料配送 

分 类 号:F252[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象