检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中南林业科技大学土木工程与力学学院,湖南长沙410004
出 处:《水利水电科技进展》2013年第1期27-32,共6页Advances in Science and Technology of Water Resources
基 金:国家自然科学基金(51108470);湖南省科技计划(2011TT2061)
摘 要:针对岩溶地区溶沟、溶洞发育等复杂地层,提出基于最小势能原理的超长桩穿越岩溶地层时的承载力计算方法。首先,构建适用于岩溶地层的桩侧摩阻力计算模型;其次,分别推导了非岩溶地层和岩溶地层中桩身的能量平衡方程,并由此得到桩身单元的位移、轴力计算式;再次,基于最小势能原理推导了桩身的势能增量计算式,并采用黄金分割搜索法作为计算程序的收敛算法。最后,以娄新资水大桥桩基工程为算例,采用文中方法对工程桩进行计算,计算结果表明超长桩穿越岩溶地层时的承载力计算方法合理可行。According to complex foundations including channeling and Karat caves in a Karst region, a new method for calculating the bearing capacity of a super-long pile was presented. First, a calculation model of pile lateral friction in Karst stratum was established, Second, energy balance equations of a super-long pile in non-Karst stratum and Karst stratum were deduced, respectively. Based on it, a displacement formula and axial force formula of the pile unit were determined. Third, the pile incremental potential energy formula was derived from the principle of minimum potential energy, with the golden section method as program convergence algorithm. At last, taking an engineering pile in the Zishui Bridge foundation as an example, the bearing capacity was calculated using the method proposed in this paper. Calculation results show that this method is reasonable and practicable, and can provide a scientific reference for research and design in actual projects.
关 键 词:超长灌注桩 岩溶地区 承载力 数值计算 最小势能原理
分 类 号:U443.15[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.175