GGH堵塞的原因分析及对策  被引量:2

Cause Analysis and Countermeasures against Clogging of GGH

在线阅读下载全文

作  者:陈仲渊 张国鑫 周海明 蔡庆明 

机构地区:[1]浙江浙能能源技术有限公司,杭州310052 [2]浙江浙能乐清发电有限责任公司,浙江温州323609 [3]浙江浙能兰溪发电有限责任公司,浙江金华321100

出  处:《浙江电力》2013年第1期40-43,共4页Zhejiang Electric Power

摘  要:通过对浙能集团所属发电厂29套GGH运行情况的分析,发现GGH堵塞的原因主要有脱硫系统设计上存在缺陷、运行指标控制和运行操作不当及煤的硫分高等。通过调整运行参数,加强压缩空气的吹扫和高压水的在线冲洗,提高电除尘和除雾器的效率,进行大通道的改造和新型化学清洗等多方面的处理措施,延缓了GGH结垢和堵塞,提高了脱硫系统的投运率,效果显著。By operation analysis of twenty nine sets of GGH in power plants affiliated with Zhejiang Energy Group, it is found that clogging of GGH is caused by defects in design of desulphurization system, inappro- priate operating index control and operation of running as well as high sulfur content in coal. By adjustment of operating parameters, purging of compressed air and on-line washing of high-pressure water, efficiency im- provement of eleetrodedust and demister, transformation of large path and new chemical cleaning, fouling and clogging of GGH is mitigated, operation ratio of desulphurization system is enhanced and the significant effectiveness is achieved.

关 键 词:GGH 堵塞 延缓 脱硫 

分 类 号:X701.3[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象