检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]浙江浙能能源技术有限公司,杭州310052 [2]浙江浙能乐清发电有限责任公司,浙江温州323609 [3]浙江浙能兰溪发电有限责任公司,浙江金华321100
出 处:《浙江电力》2013年第1期40-43,共4页Zhejiang Electric Power
摘 要:通过对浙能集团所属发电厂29套GGH运行情况的分析,发现GGH堵塞的原因主要有脱硫系统设计上存在缺陷、运行指标控制和运行操作不当及煤的硫分高等。通过调整运行参数,加强压缩空气的吹扫和高压水的在线冲洗,提高电除尘和除雾器的效率,进行大通道的改造和新型化学清洗等多方面的处理措施,延缓了GGH结垢和堵塞,提高了脱硫系统的投运率,效果显著。By operation analysis of twenty nine sets of GGH in power plants affiliated with Zhejiang Energy Group, it is found that clogging of GGH is caused by defects in design of desulphurization system, inappro- priate operating index control and operation of running as well as high sulfur content in coal. By adjustment of operating parameters, purging of compressed air and on-line washing of high-pressure water, efficiency im- provement of eleetrodedust and demister, transformation of large path and new chemical cleaning, fouling and clogging of GGH is mitigated, operation ratio of desulphurization system is enhanced and the significant effectiveness is achieved.
分 类 号:X701.3[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222